August 7
- RF field testing between UCSC site and UAM array site aboard the
Shana
Rae (Matthews)
August 11
- MVP mooring (T1) deployed from Shana Rae at location 36 55.335N, 122
08.464W; depth 69m; MVP to be attached on August 18 (Stone);
- RF field testing between Long Marine Lab site and UAM array site aboard
the Shana Rae (Matthews)
August 15
- UAM moorings (U1-U3) deployed from
Shana Rae (Frye)
- U1 - 36 56.974N, 122 08.031W; depth 40m
- U2 - 36 55.563N, 122 04.717W; depth 43m
- U3 - 36 53.365N, 122 07.438W; depth 86m
- RF communications link at UCSC installed (Matthews);
- RF communications link at Long Marine Lab installed (von der
Heydt);
- Benthic moorings (T4,T6) deployed by Ventana from Pt. Lobos (Barry)
- T4 - 36 54.9383 N, 121 57.6987 W; depth 28.7m; instruments:
benthic respirometer, Hydroscat II
- T6 - 36 55.2742 N, 122 8.3821 W; depth 62m; instruments: benthic
respirometer, Hydroscat II, S4 current meter
August 16
- UAM mooring (U4) deployed from Shana Rae at location 36 54.935N, 122
10.368W; (Frye)
- UAM acoustic testing from Shana Rae (Johnson)
- UW glider (S/N-003) deployed from John Martin (Eriksen) at C-Line
- JPL drifter deployed at M2 from Vito C; further drifter deployment
cancelled due to weather (Chao)
- JPL salinity sensor aircraft
August 17
- SIO glider deployed and recovered from John Martin (Sherman)
- UAM acoustic testing from Shana Rae (Johnson)
- MVP tested from Cypress Sea (Kelley)
August 18
- UW glider (S/N-001) deployed from John Martin (Eriksen) at C-Line
- UW glider (S/N-003) nearing end of C-line with over 80 profiles
- MVP deployment on T1 cancelled due to weather; retrying on August 23
from Cypress Sea (Kelley)
- LBL transponders (L1-L4) deployed and surveyed from Shana
Rae; L5
deployment cancelled due to high (30-knot) winds (Gashler)
- R/V New Horizon leaves Redwood City and reaches waypoint
"Fran"
at 2000h (Chavez)
- JPL salinity sensor aircraft takes off from Moffett Field and flies
over New Horizon track to calibrate sensor (Chao)
August 19
- UAM acoustic testing from Shana Rae (Johnson)
- New Horizon enters Monterey Bay and begins initial survey (Chavez)
August 20
- UAM acoustic testing from Shana Rae (Johnson)
- ADCP mooring deployed from Shana Rae (Stone)
- UW glider (S/N-003) returning on C-line
(Eriksen)
- New Horizon completes nightly towfish survey (Chavez)
August 21
- AUV acoustic communications testing from Shana Rae (Johnson)
- UW glider (S/N-004) deployed and recovered on S-line
(Eriksen)
- New Horizon completes nightly towfish survey (Chavez)
- Pt. Lobos completes day-time frontal survey
(Hamner)
- Ed Ricketts completes day-time drifter study
(Hamner)
August 22
- Pt. Sur mobilization (Bellingham)
- Pt. Lobos completes nighttime frontal survey
(Hamner)
- Ed Ricketts day-time drifter study
(Hamner)
- New Horizon completes nightly towfish survey (Chavez)
- Ed Ricketts completes daytime drifter study
(Hamner)
August 23
- Pt. Sur leaves port and begins AUV testing (Bellingham)
- MVP deployed from Cypress Sea (Kelley)
- UW gliders S/N-003 and 002 complete four and five transects on C-line,
respectively
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon completes nightly towfish survey (Chavez)
- Pt. Lobos completes nighttime frontal survey
(Hamner)
- Ed Ricketts completes day-time drifter study
(Hamner)
August 24
- Bioluminescence sensor deployed on M1 from Cypress Sea
(Kelley)
- UW glider (S/N-004) deployed and recovered at C-line from
John Martin (Eriksen)
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- Environmental Sample Processor deployed from Shana Rae
(Scholin)
- New Horizon nightly towfish survey (Chavez)
- Pt. Lobos nighttime frontal survey
(Hamner)
- Ed Ricketts completes daytime drifter study
(Hamner)
August 25
- UW glider (S/N-004) deployed at S-line from John Martin
(Eriksen)
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
- Ed Ricketts completes daytime drifter study
(Hamner)
August 26
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
August 27
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
August 28
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
- Pt. Lobos nighttime bioluminescence survey
(Widder)
- New Horizon cruise report (in MS-Word; Johnson)
August 29
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
- Pt. Lobos nighttime bioluminescence survey
(Widder)
- UW gliders recovered from John Martin; UW group departs
August 30
- AUV sampling from Pt. Sur (Bellingham)
- Nighttime bioluminescence sampling from
Shana Rae (Haddock)
- Nighttime AUV bioluminescence sampling from
Pt. Sur (Bellingham)
- New Horizon nightly towfish survey (Chavez)
- Pt. Lobos nighttime bioluminescence survey
(Widder)
|